Step 6: EAS Cutover
Issue 4 September 1995
K-9
12. Issue the
release link n
command at the administration terminal to release
any adjunct AUDIX links (where the adjunct will cause the associated
ports to be logged in).
At this point, the cutover to EAS is complete. It is recommended that a backup of
the switch translations be performed as soon as possible after the cutover to
preserve the EAS-related administration changes. Also, if agent stations are
administered with multiple sets of work-mode buttons, it is recommended that all
but one set of work-mode buttons be removed from these stations. Also, multiple
queue lights are required for EAS.