Emerson Process Management 2400S Pacemaker User Manual


 
Configuration and Use Manual 107
Measurement Performance
Measurement Performance DefaultsTroubleshootingCompensation
Detailed test data with the EDD
Note: Requires Smart Meter Verification. No detailed test data is available with the original version
of the meter verification application.
For each Smart Meter Verification test, the following data is stored on the transmitter:
Powered-on hours at the time of the test
Test result
Stiffness of the left and right pickoffs, shown as percentage variation from the factory value. If
the test aborted, 0 is stored for these values.
Abort code, if applicable
To view this data, see Figure 10-12.
Figure 10-12 Meter verification test data – EDD
2
1 Run Counter
2 Running Hours
3 Test Result
4 Abort Code
5 LPO Stiffness
5 RPO Stiffness
7 Show Results Table
8 Show Results Plot
1 Run Meter Verification
2 View Test Results
3 Schedule Meter Verification
Online >
1 Overview >
3 Shortcuts >
6 Meter Verification
Online >
3 Service Tools >
4 Maintenance >
1 Routine Maintenance >
3 Meter Verification
Test Result #x
Run Counter
Running Hours
Test Result
Abort Code
LPO Stiffness
RPO Stiffness
Abort
OK
To previous test
7