Emerson Process Management 2400S Pacemaker User Manual


 
92 Micro Motion
®
Model 2400S Transmitters for PROFIBUS-DP
Measurement Performance
SENSOR
VERFY/x%
Figure 10-1 Meter verification procedure – ProLink II
Verify configuration
parameters
Tools >
Meter Verification >
Structural Integrity Method
View previous test data
Next
Enter optional test data
Initialize and start meter
verification
Next
Abort
Next
Fault
configuration
Hold last
value
Progress bar shows
test in progress
Next
Finish
(2)
Graph of results
Rerun
test?
Yes
PassFail
No
Start
Back
(1)
View report (option to print
or save)
Back
Abort
(1) If the graph was viewed at the beginning of the procedure,
clicking Back here will return to the beginning of the procedure
(along the dotted line).
(2) The results of the meter verification test are not saved until
Finish is clicked.