Reliant PB6001401 Thermometer User Manual


 
9-2
Installation and Maintenance
V
olume
Octel Overture 200/300 Serenade 3.0
PB60014–01
Power Supply Output
Check
voltages using a digital volt meter
. Refer to the Installation chapter
, Octel Overture 200/300
Hardware Installation section, in this volume.
Preventive Maintenance Tools and Equipment
The
tools and equipment required to perform preventive maintenance tasks on the Octel Overture
200/300 are as follows:
-
Antistatic wrist strap
-
Digital volt/ohm meter
-
RS-232C-compatible ASCII send/receive terminal capable of 300, 1200, or 9600 baud. Refer to the
Installation chapter
, T
erminal Communications section, in this manual.
-
Three standard, touch-tone telephones
- T
elephone test set (butt set)
- Lar
ge, flat-bladed screwdriver
-
No. 1 Phillips screwdriver
-
IC puller
-
Breakout box
-
Digit grabber
- Flashlight
Octel
Overture 200 Diagrams
Use
the following Octel Overture 200 diagrams to provide assistance when performing preventive
maintenance or replacing components. Figure 9-1 shows the Octel Overture 200 shelf structure.
Figure 9-2 through Figure 9-4 illustrate the front, rear
, and inside views of the Octel Overture 200 server
.