4-58
Installation and Maintenance
Volume
Octel Overture 200/300 Serenade 3.0
PB60014–01
4.12 TESTING
THE INST
ALLA
TION AND TELEPHONE CHANGES
Use
the following checklist to help track any installation and telephone changes, as follows:
-
Use the “See Chapter” column for reference to the appropriate chapter in the
Installation and
Maintenance
volume for further information.
-
Enter the name of the person who is responsible for tracking an installation task in the “Person
Responsible” column.
-
Enter the date the installation task is to be completed in the “Scheduled” column.
-
Enter the final completion date in the “Completed” column.
Installation Task See
Chapter
Person
Responsible
Scheduled Completed
Receiving
the Equipment
Inspect for damage
Installation
Carton
Server
ac/dc cables secure
Printed circuit cards
Reshipping procedures
Preinstallation
Environment
Installation
Dust free (Y/N)
A
way from lar
ge motors (Y/N)
Server accessible (Y/N)
Power
Dedicated fuse or breaker
Dedicated 1
15-V
ac 60-Hz
receptacle
Other required equipment available
Modular line cord
RJ1
1 jacks or equivalent
CA
T or other ASCII terminal
Phillips screwdriver
RS-232C interface cable