Teledyne API M100E Analyzer Operation Manual Getting Started
37
3.5.1. STARTUP
After the electrical and pneumatic connections are made, turn on the instrument. The pump and exhaust fan
should start immediately. The display should immediately display a single, horizontal dash in the upper left
corner of the display. This will last approximately 30 seconds while the CPU loads the operating system.
Once the CPU has completed this activity it will begin loading the analyzer firmware and configuration data.
During this process, string of messages will appear on the analyzer’s front panel display:
Figure 3-10: Startup – Front Panel Display
The analyzer should automatically switch to Sample Mode after completing the boot-up sequence and start
monitoring SO
2
gas.
04515F DCN6048