Philips 612 Ultrasonic Jewelry Cleaner User Manual


 
4535 612 34161 HD3 Service Manual Page 71
CSIP Level 1 Installation: Inspecting the System
Uncrating
Uncrate the system by following the instructions in “Uncrating the HD3 Ultrasound System” on
page 90. (Instructions for re-crating the system for shipment are provided in Section 10, “Disas-
sembly”.)
Inspecting the
System
After the system is uncrated (“Uncrating the HD3 Ultrasound System” on page 90), conduct the
following inspections. Report any damage or missing inventory to the carrier and to the
Philips Ultrasound traffic department.
WARNING Dangerous voltages are present inside the system. Do not install the system power cord or con-
nect it to AC line voltage until correct line voltage has been verified, a thorough inspection of the
system has been performed, and the system has been properly assembled.
To inspect the system after uncrating
1. Inventory the shipment against the packing list.
2. Inspect the outside surfaces of the system, monitor, and peripherals for damage.
3. Unlatch and rotate the control panel to verify that proper left and right swivel and up/down
movement.
4. Verify that the system rolls and turns smoothly on its casters.
5. Verify that proper caster brake and swivel operation.
6. Remove the system covers.
7. Remove any loose packing material, dust, or debris from the interior of the system.
8. Verify that there is good continuity between the power supply and system ground.