Emerson 3000 Oxygen Equipment User Manual


 
Instruction Manual
IB-106-300NH Rev. 4.3
May 2005
5-10 General User Interface (GUI) Operation Rosemount Analytical Inc. A Division of Emerson Process Management
World Class 3000
Table 5-4. CALIBRATE O
2
Sub-Menu
SUB-MENU
SELECTION
SETUP SETTING
(SEE TABLE 3-5) DISPLAY DESCRIPTION
Perform
Calibration
Auto Cal in Probe
Setup is YES
Press ENTER to start Auto
Calibration.
MPS will start calibrating probe.
Starting Automatic Calibration
High Gas _____% O
2
Time Left 0:00
Value for high O
2
calibration gas.
Amount of time necessary to com-
plete the current testing phase in
min:sec.
Cell mV ______mV Cell voltage of the probe.
Low Gas _____% O
2
Time Left 0:00
Value for low O
2
calibration gas.
Amount of time necessary to com-
plete the current testing phase in
min:sec.
Cell mV ______mV Cell voltage of the probe.
Resistance Check
Time Left 0:00
Resistance check in progress.
Cell _____mV _____C
Calibration Complete
Purging 0:00
Cell voltage and probe temperature.
Gas lines are being purged of cali-
bration gas.
Cell _____mV _____C
Calibration Complete
Cell voltage and probe temperature.
Auto Cal in Probe
Setup is NO.
Press ENTER to start Manual
Calibration.
Manual calibration sequence will
begin when ENTER is pressed.
Switch ON high calibration gas.
Press ENTER when ready.
High gas ______% O
2
High O
2
calibration gas value.
Press ENTER when O
2
reading
is stable.
Turn OFF high calibration gas
and ON low calibration gas.
Press ENTER when ready.
Low gas ______% O
2
Low O
2
calibration gas value.
Press ENTER when O
2
reading
is stable.
Resistance Check. Resistance check in progress.
Turn off low calibration gas.
Press ENTER when ready.
Press ENTER when probe has
returned to process.