Emerson 3000 Oxygen Equipment User Manual


 
Instruction Bulletin
Appendix A Rev. 3.9
May 2005
Rosemount Analytical Inc. A Division of Emerson Process Management Appendices A-9
World Class 3000
06
GASKET AND
HARDWARE
6.50
(165.1)REF
DRAIN
A
A
STD20
FT
(6.1 M)CABLE
27.31 (693.67)
CLEARANCE REQ
FOR PRO
BE
INSERTION
ANDREMOV
AL
FLANGE
06
01
02 03
04
05
GASKET AND HARDW
ARE
4
3
6
19.80 (502
.92)
FOR
3D3947G01
6.0
(152.4)REF
62.50 (1587.5) REF (4507C26G03)
26.50 (673
.1)REF (4507C26G0
1AND G02)
30.62 (777
.75) REF (4507C26G0
1)
73.00 (1854.2) REF (4507C26G02)
109.00 (2768
.6) REF (4507C26G03)
37.00 (939.8) REF (4507C26G0
1)
DIRECTION
OFFLOW
OPTIO
NAL
MOUNTING
ARRANGEMENT
, 4 IN.
150# FLAN
GESUPPLIED
BY CUSTOMER
NOTES:
REFERENCEAIR SUPPL
Y CONNECTION BITE TY
PE FITTIN
G(P
ARKERCPI) FOR
0.250 O
.D.TUBING. 2 SCFH A
T 3PSIG MAX.
CLEAN
DR
YAIRREQUIRED. FITTIN
G
IS LOCA
TEDONF
AR SIDE.
LAG TO ENSURE GAS TEM
PERA
TURE DOES NOT
GO BELOW DEW PO
INT
OR
EXCEED 500
C.
o
INSTALL WITH ANALYZER IN A
VERTICALLY DOWNWARDS DIRECTION ONL
Y.
FLUE GAS OPERA
TING TEMPERA
TURE RANGE1200
TO 1800 F (650 TO 980 C).
oooo
RECOMMEN
DED TWO INCH THK INS
ULA
TION. THE
RMAL
CONDUCTIVITY
K
EQUALS 0.5 FOR INSULA
TION.
DIMENSI
ONS AREININ
CHES WITH MILLIMETE
RSINP
ARENTHESES.
1.
2.
3.
4.
5.
6.
7.
4.026
(102.26)
I.D.
2
1
REF
AIR
CAL
GAS
ELECT CABLE
VIEW
A-A
GROUP NOTE
A 3 FT (914.4)GAS TUBE PICK-UP
B 6 FT (1828.8) GAS TUBE PICK-UP
C 9FT(2743.2) GAS TUBE PICK-UP
CALIBRA
TIONAND PURG
E GAS CONNECTION. BITE TY
PE FITTIN
G(P
ARKERCPI)
10 SCFH AT 32 PSIG MAX.
CALIBRA
TION GAS REQUIRED.
IF EQUIPPED WITH THE
OPTIONAL
CERAMICDIFFUSOR ASSEMBL
Y, PRO
BE
ASSEMBLYMUST BE ORIENTE
D SO THA
T
VEE SHIEL
D IS SQUARET
OGAS FL
OW
.
272700
17
Figure A-15. Bypass Probe Option (Sheet 1 of 3)