2-20
E Pass the overflow hose from
the reservoir tank through the
clamp inside the frame.
F Clamp the mainharness, battery
(+) lead and (–) lead to clamp
of the frame.
G Clamp the fuel sender lead to
the pipe.
H The mainharness connecting
to the taillight assembly to
the frame.
I Connect the taillight
assembly lead to the
mainharness over the
mudguard.
CABLE ROUTING
SPEC
J Keep the clamping clearance
over 5 mm.
(Bend the metal clamp to keep
the clearance between the
metal clamp and link over
5 mm.)
K Install the meter cable with
its sheaved side facing to the
meter gear.
L Separate the thermo switch
lead and ather lead forward
inside the frame.