Emerson Process Management IM-106-340 Oxygen Equipment User Manual


 
Instruction Manual
IM-106-340, Rev. 4.0
May 2006
Oxymitter 4000
http://www.processanalytic.com
Section 4 Configuration of Oxymitter 4000
with LOI
Verify installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 4-1
Logic I/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 4-4
VERIFY INSTALLATION
Mechanical Installation Ensure the Oxymitter 4000 is installed correctly. See Section 2: Installation.
Terminal Block Wiring 1. Remove cover (27) to expose terminal block (25).
2. Check the terminal block wiring, Figure 4-1. Be sure the power, 4-20 mA
signal, and logic outputs are properly connected and secure.
3. Install housing cover (27, Figure 9-3 or Figure 9-4) on terminal block
(25).
Install all protective equipment covers and safety ground leads before equipment startup.
Failure to install covers and ground leads could result in serious injury or death.