Emerson Process Management IM-106-340 Oxygen Equipment User Manual


 
Oxymitter 4000
2-18
Instruction Manual
IM-106-340, Rev. 4.0
May 2006
IMPS 4000
CONNECTIONS
See the IMPS 4000 Intelligent Multiprobe Sequencer Instruction Manual for
wiring and pneumatic connection.
SPS 4001B
CONNECTIONS
See the SPS 4001B Single Probe Autocalibration Sequencer Instruction
Manual for wiring and pneumatic connection.
NOTE:
Upon completing installation, make sure that the Oxymitter 4000 is turned on
and operating prior to firing up the combustion process. Damage can result
from having a cold Oxymitter 4000 exposed to the process gases.
During outages, and if possible, leave all Oxymitter 4000 units running to
prevent condensation and premature aging from thermal cycling.
If the ducts will be washed down during outage, MAKE SURE to power down the Oxymitter
4000 units and remove them from the wash areas.