4. PROCEDURE BEFORE DAILY OPERATION EO1-31009
4.1 Installation of the Scale
4- 1
4. PROCEDURE BEFORE DAILY OPERATION
4.1 Installation of the Scale
Install the scale on the well-ventilated, plane and level surface. Be sure to provide enough space
around the scale as follows for easy operation.
As viewed from the top As viewed from the right side
NOTES:
1. Remove anything that touches or may touch the platter around the scale. Failure to do this may cause
incorrect weighing operation.
2. Avoid the location where the scale is subject to the direct wind from the air conditioner. Failure to do this
may cause incorrect weighing operation.
3. TOSHIBA TEC will not guarantee any problems with the scale and the peripheral devices caused by
installation or removal of the peripherals by yourself.
4.2 Preparation
Before starting the business hours, perform the following preparatory operations.
1. Plug in the scale. (Refer to Section 5.)
2. Adjust the level of the scale. (Refer to Section 6.)
3. Turn ON the power switch. (Refer to Section 7.)
4. Adjust the angle of the operation panel. (Refer to Section 9.)
5. Load the media. (Refer to Section 8.)
After the business hour is over, clean the scale.
1. Turn OFF the power switch. (Refer to Section 7.)
2. Clean the scale. (Refer to Section 11.)
WARNING!
When installing the scale, avoid locations that have the following adverse conditions. Failure to do this
may cause a fire, electric shock, or injury.
Direct sunlight, high temperature, high humidity, rapid temperature change, vibrations, dust, near a
device generating magnetism or electromagnetic wave, near fire or moisture, unstable table.
50 mm 50 mm
150 mm
Platter
Power Cord
CAUTION!
Basically, the power cord should come out from the left side of the scale being fitted into the ditch of th
e
scale bottom. If it cannot, care must be taken when adjusting the adjustable legs so as not to squash
the power cord.
Ditch