Chapter 3. Electrical System
This chapter discusses the electrical installation and electrical setup aspects of the
F300S/F300SQ Ultraviolet Lamp System.
Electrical Installation/Setup Checklist
Before operating the ultraviolet lamp system for the first time, be sure the following
items have been reviewed and/or tested.
Accessory Parts List
The Accessory Parts List is located in Appendix E, “Replacement Parts,” and should
be reviewed when setting up your system.
Table 4. Electrical Installation and Setup Checklist
Item Chapter
AC input voltage matches equipment label and
connected correctly
Chapter 3, “Electrical System”
Power supply HV capacitors tapped for AC line
frequency
Chapter 3, “Electrical System”,
page 51
Power supply HV transformers correctly tapped for AC
input voltage
Chapter 3, “Electrical System”,
page 51
Programming correct for each unit Chapter 3, “Electrical System”,
page 43, page 44
Interconnection cables secure Chapter 3, “Electrical System”,
page 44, page 49
RF cable secure Chapter 3, “Electrical System”,
page 45, page 49
User inputs (EXTERNAL INTERLOCK, SYSTEM
BLOWER) connected if wanted
Chapter 3, “Electrical System”,
page 40
Remote inputs (RESET, LAMP ON) connected if
wanted
Chapter 3, “Electrical System”,
page 45
User outputs (FILAMENT ON, HV ON, FUTURE USE,
LAMP ON, and PRESS ENABLE) connected if wanted
Chapter 3, “Electrical System”,
page 46
Review normal operating procedures Chapter 4., Operation, on page 55