Bedside Unit
Configuration Options
96
QC Test Period
❍
Time of day____
❍
Elapsed time
____ hours
Frequency of performing a
QC test is defined as a set
time each day or an elapsed
time between 6 and 24
hours.
QC Action Messages Messages displayed in the
bedside unit following a
failed QC test. These
messages allow you to
record the steps taken to
correct the problem. You
are required to select at
least one message.
Failed QC Guiding
Messages
Messages that appear at a
QC result screen when the
test fails. These messages
offer possible reasons why
the test failed.
Failed QC Message
Entry Required
❍
Yes
❍
No
If a QC test result fails, you
may be required to select a
comment that corresponds
to the failed test result.
Configuration Option Meaning
BU.book Page 96 Monday, October 28, 2002 11:14 PM