SECTION 25—SIEVE BED PRESSURE CHECK
Part No 1148070 87 Perfecto
2
™
4. Checkeachconnectiontomakesureitistight.
5. TurntheconcentratorOn().
NOTE:AdjusttheconcentratortoMAXIMUMratedliterflowto5L/min.
NOTE:Waitapproximatelyfiveminutestoallowsystempressurestoachieveproperequilibrium
beforetesting.
6. Thepressureintheconcentratorshouldrisewithin20secondsto21p.s.i.g.±0.3and
shiftthe4‐wayvalvetotheoppositesievebed.
7. Afterthe4‐wayvalveshift,thepressureintheconcentratorwilldropto12p.s.i.g.±2
beforerisingwithin20secondsto21p.s.i.g.±0.3andshiftthe4‐wayvalvetothe
oppositesievebed.
8. Ifpressurereadingis21p.s.i.g.±0.3whenbothvalveshiftsaremade,proceedtoSTEP
10.
9. Ifpressureintheconcentratordoesnotfallintothespecificationslistedabove,refer
toTroubleshootingonpage 16.
10. Turntheconcentratoroff(O).
11. DisconnectpressuregaugefromtheHomeFillportandreinstallplug.
FIGURE 25.2 Pressure Testing
I/
Pressure
Gauge
Back of
Concentrator
Plug
¼ x 2-inch
Silicone Tubing
with Connector
HomeFill Port