SECTION 20—4-WAY VALVE/MANIFOLD ASSEMBLY
Perfecto
2
™
66 Part No 1148070
CAUTION
TorquesequenceandspecificationMUSTbeadheredtoorpossibledamagetothe4‐way
valvecouldresult.
15. Tightenmountingscrewsinthesequencedescribedbelow(Detail“B”).
16. Pre‐torquethemountingscrewsto10±2inch‐lbsusingthetorquesequence.
17. Themountingscrewscanbenowbetorquedto22±2inch‐lbsinthesamesequence.
18. Connectspadeconnectorslocatedonthesideofthe4‐wayvalveassembly.
19. Positionthe4‐wayvalve/manifoldassemblyinthebaseoftheconcentratoronthe
foamblockintheorientationnotedinSTEP 9.
20. Slidethevinyltubesontoeachsideofthemanifold/valveassembly.
21. Usingahoseclamptool,securethevinyltubestothe4‐wayvalve/manifoldassembly
withtheclamps.
22. Installthe“F”tubeintothe4‐wayvalve/manifoldassembly.
23. Securethe“F”tubetothe4wayvalve/manifoldassemblywithtwotiewraps.
24. Installthemanifoldexhausttubeintothe“F”tube.
25. Securethemanifoldexhausttubetothe“F”tubewithatiewrap.
26. Installcabinet.RefertoRemovingCabinetonpage 23.