Digi DC-190 Scale User Manual


 
Installation 9
2.5 Installing Cable Strain Relief
To prevent load cell or peripheral cable damage from
bending and twisting, cable strain reliefs are used in
the back of the DC-190 keyboard. Each DC-190
counting scale comes equipped with these rubber
strain reliefs and should be installed on initial scale
setup.
1. Remove the three 4 mm x 8 mm panhead
screws securing the bracket to the back of the
keyboard.
2. Remove rubber strain relief covering the two
14-pin load cell cable ports. If any peripheral
devices are installed at this time, remove the
rubber strain relief covering the peripheral
cable access ports.
3. Route load cell and/or any peripheral device
cables through opening in bracket. Connect
cables to proper ports.
4. Install rubber strain relief over load cell/
peripheral cables and position into cavity.
Gently pull cables to take up any slack.
5. When rubber strain reliefs are securely
mounted, reinstall bracket using the three 4
mm x 8 mm panhead screws previously
removed.
2.6 Pole Mounting Instructions
1. Disconnect AC power cord from the bottom
of the scale. Remove platform.
2. Remove the plastic cover from the upper
mounting bracket.
NOTE: As a precaution, install load cell setscrew.
3. Turn scale on side.
4. Attach pole mount assembly to base using
three 4 mm x 10 mm machine screws (shown
in Figure 2-9).
Figure 2-9. Attach Pole Mount Assembly to Base
5. Route load cell and peripheral device cables
through center of pole mount assembly.
6. Mount keyboard on bracket using six 4 mm x
10 mm machine screws (Figure 2-10).
Figure 2-10. Attach Keyboard to Pole Mount Assembly
7. Attach load cell cable to Cable Port 1. If any
other scales or peripheral devices are to be
installed, remove plastic knockout from
plastic shroud as required. Install plastic cover
using two 4 mm x 8 mm panhead screws.
8. Install plastic cover over base of pole mount
assembly.
9. Remove the load cell setscrew previously
installed.
POLE ASSEMBLY
MOUNT BRACKET
KEYBOARD MOUNT BRACKET
KEYBOARD