![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/d/c0/dc0a7801-2912-432b-8b48-e98da4b530b4/dc0a7801-2912-432b-8b48-e98da4b530b4-bg22.png)
Contents
34 S8100 Installation and Upgrades
November 2003
• Safety precautions 53
Electromagnetic interference 53
Customer’s safety responsibilities 53
Antistatic protection 53
Control circuit packs versus power 54
• Avaya Product Documentation web page 54
• Avaya Publications Center 54
• Sending comments 55
1 Install and cable a G600 cabinet 57
• Section I – S8100 with a G600 installation 58
• Site requirements 58
• Check customer’s order 59
• Correct shipping errors 59
• Unpack and inspect 60
• Install and cable a G600 cabinet 65
Verify the carrier address ID on G600 cabinets 65
Floor mount a G600 cabinet 67
Rack mount a G600 cabinet 68
Rack mount two G600 cabinets 71
• Check AC power and ground for G600 72
Check AC power 72
Approved grounds 73
Approved floor grounds 73
Uninterruptible power supply 74
Cabinet’s power switch 74
Connect cabinet’s grounds and other grounds 75
Install coupled bonding conductor 78
Connect the power cords 78
• Cable a G600 system 78
Install Processor Interface cable 79
Cable a 2-cabinet G600 system 80
Cable a 3-cabinet G600 system 84
• Install G600 patch panels and external modem 84
Install patch panels and shelf 84
Install the external modem 85