Emerson 3000 Oxygen Equipment User Manual


 
Instruction Manual
Appendix A Rev. 3.6
July 1998
Rosemount Analytical Inc. A Division of Emerson Process Management Appendices A-9
World Class 3000
06
GASKET AND
HARDWARE
6.50
(165.1) REF
DRAIN
A
A
STD 20 FT
(6.1 M) CABLE
27.31 (693.67)
CLEARANCE REQ
FOR PROBE
INSERTION
AND REMOVAL
FLANGE
06
01
02 03
04
05
GASKET AND HARDWARE
4
3
6
19.80 (502.92)
FOR
3D3947G01
6.0
(152.4) REF
62.50 (1587.5) REF (4507C26G03)
26.50 (673.1) REF (4507C26G01 AND G02)
30.62 (777.75) REF (4507C26G01)
73.00 (1854.2) REF (4507C26G02)
109.00 (2768.6) REF (4507C26G03)
37.00 (939.8) REF (4507C26G01)
DIRECTION
OF FLOW
OPTIONAL MOUNTING
ARRANGEMENT, 4 IN.
150# FLANGE SUPPLIED
BY CUSTOMER
NOTES:
REFERENCE AIR SUPPLY CONNECTION BITE TYPE FITTING (PARKER CPI) FOR
0.250 O.D. TUBING. 2 SCFH AT 3 PSIG MAX. CLEAN DRY AIR REQUIRED. FITTING
IS LOCATED ON FAR SIDE.
LAG TO ENSURE GAS TEMPERATURE DOES NOT GO BELOW DEW POINT OR
EXCEED 500 C.
o
INSTALL WITH ANALYZER IN A VERTICALLY DOWNWARDS DIRECTION ONLY.
FLUE GAS OPERATING TEMPERATURE RANGE 1200 TO 1800 F (650 TO 980 C).
oooo
RECOMMENDED TWO INCH THK INSULATION. THERMAL CONDUCTIVITY K
EQUALS 0.5 FOR INSULATION.
DIMENSIONS ARE IN INCHES WITH MILLIMETERS IN PARENTHESES.
1.
2.
3.
4.
5.
6.
7.
4.026
(102.26)
I.D.
2
1
REF
AIR
CAL
GAS
ELECT CABLE
VIEW
A-A
GROUP NOTE
A 3 FT (914.4) GAS TUBE PICK-UP
B6FT(1828.8) GAS TUBE PICK-UP
C9FT(2743.2) GAS TUBE PICK-UP
CALIBRATION AND PURGE GAS CONNECTION. BITE TYPE FITTING (PARKER CPI)
10 SCFH AT 32 PSIG MAX. CALIBRATION GAS REQUIRED.
IF EQUIPPED WITH THE OPTIONAL
CERAMIC DIFFUSOR ASSEMBLY, PROBE
ASSEMBLY MUST BE ORIENTED SO THAT
VEE SHIELD IS SQUARE TO GAS FLOW.
27270017
Figure A-13. Bypass Probe Option (Sheet 1 of 3)
A