Multiquip C-30HD Oxygen Equipment User Manual


 
PAGE 90 C-30HD PARTS & OPERATION MANUAL REV. #4 (03/06/01)
C-30HD SERVICE INFORMATION BELT AND CHAIN ADJUSTMENT
1. Loosen the pillow bearing bolts only to the point where the
bolts will remain snug.
2. Unlock the two pusher bolt lock nuts.
3. Turn each pusher bolt clockwise an equal amount until the
chain is to proper adjustment of approximately 3/8" to 1/2
slack in the chain. It is very important that the pulley side and
the chain side (pillow block bearings) are within 1/16 of an
equal distance.
4. This distance can be checked by using a tape measure or
a straight edge ruler, measuring from the inside of the pusher
bolt bracket to the face of the pillow block bearing.
5. The drive chain should be adjusted regularly to remove all
slack. Once all slack is removed, do not over-adjust, as this
will overload the shaft bearings. A slack chain on the crank
drive creates backlash and shock loads on the shafts and
bearings which results in shorter wear/life of the drive
components. Lubricate the chain regularly. Note-it is advisable
to carry a spare chain and master links for replacement in the
field if necessary.
6. Drive belts should be regularly adjusted to prevent slippage.
To adjust the belts, loosen the engine mounting bolts and
move the engine until there is a maximum 3/4" deflection in
the belts, retighten the engine mounting bolts.
7. Frequent inspections should be made on all drive
components to make certain that all bolts and nuts remain
tight.
NOTE: PRIOR TO ADJUSTING CHAIN PLACE THE
LOBE OF THE CAM IN THE DOWN POSITION.
THE CHAIN SHOULD HAVE 83 RIVITS
INCLUDES (ONE EACH, HALF LINK AND FULL
LINK)
3/4" MAX.
DEFLECTION
PULLEY
PILLOW BLOCK BEARING BOLTS
LOCK NUTS
CHAIN
BELTS
PUSHER BOLT BRACKET
PUSHER
BOLTS