Emerson Process Management 3000 Oxygen Equipment User Manual


 
Instruction Manual
IB-106-300NH Rev. 4.2
July 2002
Rosemount Analytical Inc. A Division of Emerson Process Management Installation 2-21
World Class 3000
1
2
NOTES:
100 V.A.C. OPERATION REQUIRES TRANSFORMER PART
NUMBER 1M02961G02.
REFER TO TABLE 3-5 FOR PROPER SET POINT SELECTION.
1
2
0310122
Figure 2-16. Jumper Selection Label
NOTE
Before supplying power to the heater
power supply, verify that jumpers JM3,
JM6 are removed and JM7 is installed.
If relay wire (Figure 2-14, note 1) is in-
stalled, JM2 must be removed from
HPS Mother Board (Figure 2-17).
4. Before supplying power to the heater
power supply, verify that the jumpers
on the mother board, Figure 2-17, are
properly configured. Jumpers JM3 and
JM6 should be removed and JM7
should be installed.
Additionally, make sure that the proper
jumper for your line voltage is installed,
Figure 2-16. If relay wire (Figure 2-14,
note 1) is not installed, JM 2 should be
installed on the HPS Mother Board
(Figure 2-17).
NOTE
Refer to Figure 2-9 and Figure 2-11 for
proper IFT jumper configuration. IFT
microprocessor and interconnect
board jumper configurations must be
set correctly in order for HPS to work
properly.
29850001
NOTE: ALL FUSES ARE 5A @ 250 VAC,
ANTI-SURGE, CASE SIZE
5 X 20 MM, TYPE T TO IEC127,
SCHURTER.
3D3 080G REV
JM1
JM2
JM4
JM5
JM7
FUSE
FUSES
Figure 2-17. Jumpers on HPS Mother Board
2