Sterling 822.00292.00 Hair Dryer User Manual


 
Large Dehumidifying Dryers Operation 35
Chapter 5: Operation
5-1 Initial Start-up
Pre-Startup Checks
; Check the process and return hoses for tight connections.
; Check all companion equipment, such as the drying hopper; verify that the loading
system is ready for operation.
; Verify that all dryer electrical connections are tight.
Auto-Tuning the Dryer
1. For Auto-tuning, press the beige button once. The AT screen will show with the
setting OFF.
2. Press the UP arrow to change the setting to ON.
3. Press the beige button again to go back to the Temperature Screen. Your actual
temperature will start to flash for about 10-20 minutes with the temperature
fluctuating up and down during that period. After the flashing stops, it means auto-
tuning has finished.
Shutting Down the Dryer
1. Turn off the conveying system supplying the drying hopper.
2. When processing is complete, close the hopper slide gate and shut down any in-line
companion equipment, such as the aftercooler.
3. Turn the Dryer OFF/ON/START selector switch to OFF.
4. Turn the system’s disconnect switch to OFF.
5. If needed, empty the drying hopper.
6. For maintenance or a long term shutdown, open (de-energize) the electrical
disconnects at the dryer and at the power drop.