CONAIR
MARTIN
05-15-96 79 28
12. Transporting and storing
12.1 Overview
Handling and transporting of the machinery should be carried out by specially
trained personnel.
The machine is packed in weather-proof and partly shock-proof plastic sheeting.
It is fixed with straps to a pallet for transportation.
12.1.1 Unpacking and checking
• Check that the machine has not been damaged in transit. Report any damage
to the forwarder.
• Do not unpack the machine until it has been moved to its installation
location.
• After unpacking, check that the delivery is complete by checking against the
delivery note.
12.1.2 Lift and transport to installation location
For information about the machine's weight, refer to chapter 2, Technical data.
For information about the space required, refer to chapter 10, Layout.
The machine can be lifted and handled using a fork-lift truck.
12.1.3 Placing at the installation location
See chapter 5, Installation.
12.2 Storing
Normally, the machine is pre-packed for transport to the installation location
where it is to be put into operation immediately. Therefore, it is only protected
with rust-preventive oil.
12.2.1 Long-term storage
• The machine should be kept in a storage area with constant temperature and
humidity.
• Before storing for a long time, the machine should be given a coating of
long-term rust preventive, for example Castrol DWX 160 with durability
24␣ -␣ 36 months in a suitable storage area.
12.2.3 Preservation
The machine is protected with rust-preventive oil Castrol DWX 22 on all
surfaces which are not painted or rust-free.
12.2.4 Durability
The rust protection from the rust-preventive oil Castrol DWX 22 is effective for
up to 12 months if the conditions described in 12.2.1 are fulfilled.