SECTION
3 Check Strip Test
6
Check your Meter when new or any time after use,
to make sure that electronics are working properly.
HOW:
1. Remove the Check Strip from
the package (save the package).
2. Insert the Check Strip (“check”
side up) fully into the Meter
until you hear a beep. A full
display* shows, followed by
another beep and then the
Check Strip result.
3. The Check Strip result must be
within the range listed on the
Check Strip package insert. If
not, see the problem solving
chart in Section 11.
4. At the end of the test, carefully
remove the Check Strip from the
Meter and return it to its
package.
*A full display, as shown here, indi-
cates that all characters are working.
If ever all the display segments do
not appear, see Section 11.