A&D 1WMPD4002313 Scale User Manual


 
5
4. INSTALLATION and PRECAUTIONS
4-1. Precautions for Installing the Indicator
Ground the indicator so that the user will not be subjected an electric shock.
Do not handle the main power cord with wet hands.
The AC plug is not water-resistant. Install it in an area where it does not get wet.
Do not install the indicator where there is flammable or corrosive gas present.
Do not install the indicator under water.
Do not pull, fold or arrange cables forcibly.
Use shielded cables for all connections.
Ground the platform to be connected to the indicator to avoid a risk of electric shock.
Read the section “CAUTION” in the instruction manual of the FS-i to
understand the conditions and precautions for installation, operation and
cleaning the indicator.
4-2. Load Cell Connections
Solder the load cell cable to the connector plug (1JMNJW-165-PM7) provided with
the FS-D and connect it to the connector on the bottom of the FS-D.
1. Use the supplied hexagonal wrench (1.27 mm / 0.05 inch) to loosen the setscrews A
and B to disassemble the connector plug.
2. Put the load cell cable through each parts of the connector taking care of their order
and directions.
3. Remove the sheath and wire covering of the load cell cable referring to the drawing
below.
The external diameter of the applicable load cell cable is Ø5.7 ~ Ø6.8 mm.
Load cell cable
3.2 mm
16 mm
Ø5.7 ~ Ø6.8 mm
Load cell cable
Setscrew B
Setscrew A Pin contacts
Connector plug (1JMNJW-165-PM7)