17
INSTALLATION
13
14
15
Attach the microswitch cable assembly to the microswitch's in-
stalled in step 12. See diagram for proper connection.
Find a suitable location for the main Tempest electrical box on
the NOPS of the press. Route the exhaust fan cable (this cable
has female pins in the connector on the end) into the delivery
and connect it to the exhaust fan installed in a previous step.
Route the impression signal cable (this cable has male pins in
the connector on the end) through the press and connect it to
the the cable that was attached to the micro-switches installed
in the previous step. Use the provided tie-wraps to secure the
cable as necessary to clear any moving parts of the machine.
Remove the cover from the main Tempest
®
electrical cabinet and
insert the dryer cable through the strain relief on the bottom of the
box. Insert the wires into the green connector by matching the
number on the wire to the number on the connector. Secure the
ground wire to the stud on the inside of the box. Tighten the strain
relief and replace the cover on the box.