A SERVICE OF

logo

THERMOSALD ISC – MANUAL QUICK START Rev. 2005 / 03
Manual cod.: 3ES080x_Vx_QS_EN Page Nr. 11 Tot. Nr . 11
STURT UP THE SISTEM INTO SERVICE BASIC SETUP MULTI-LINGUAL CONTROL PANEL
(+RS485 OPTION)
Step 1 Carry out the calibration procedure after performing the steps indicated in paragraph 4.1.
Step 2 Make sure the machine is at ambient temperature
Step 3 The Pre-Heat and Heat-Sealing controls should be inactivated.
Step 4 Power up the temperature controller
Step 5 In the event of faults ( the Red ALARM LED on the temperature controller comes on), follow the instructions given
on the control panel and put the faults right as required (the number of the fault occured is displayed on the control panel
along with the relevant description in one of the 6 languages provided).
Step 6 Calibration: keep the CAL button on the multi-lingual control panel pressed for 3 seconds as indicated in the
illustration below, Figure 3 (the four LEDS on the equipment go on flashing as long as calibration is being performed).
NOTE: For further calibration procedures, press buttons CAL+MODE+CAL on the multi-lingual panel in the order given .
Also refer to the illustration below, Figures 1+2+3:
Figure 1 Figure 2 Figure 3
NOTE: Calibration can be carried out from the "outside" as described in paragraph 4.2 with the basic setup.
Step 7 The system is ready to cycle once the calibration procedure has been carried out. Set the Pre-Heat and Heat-Sealing
temperatures (press the MODE+MODE button in the sequence given to access the TEMPERATURE submenu - refer to
paragraph 4.7).
Step 8 To go back to the initial display, press the RES button and follow the instructions given.