A SERVICE OF

logo

12
12. See the lower drawing. Position the Uprights
(53, 54) so that the Frame (51) is centered be-
tween them.
Firmly tighten the two M10 x 60mm Patch Bolts
(1) and the four M10 x 75mm Bolts (2) (only one
side is shown). Be careful not to overtighten
the M10 x 60mm Patch Bolts. Raise the
Uprights (53, 54).
12
2
53, 54
1
53
51
54
Top View
11. With the help of a second person, carefully lower
the Uprights (54, not shown) to the floor.
A
ttach the ground wire on the Wire Harness (39)
to the indicated hole in the Base (52) with an M4
x
10mm Ground Screw (84).
52
39
Ground Wire
11
84
Hole
54