UVPS 81-0112-01 Rev C Light Therapy Device User Manual


 
UV CROSSLINKERS UVP
6. To secure the starter holder, place the holder in your right hand and with your left hand in
the chamber, press the now loosened reflector adjacent to the holder inwards. This will
push the black spigots inwards thereby securing the starter holder.
7. Re-fit the reflector.
Replacement of fuse holders
These are located at the back of the unit just above the mains connector. There are two fuses in
separate holders. Replacement is the same for both.
1. Cut back the heat shrink on the two wires.
2. Unsolder both connections and pull from the holder.
3. Unscrew the nylon nut and push the holder out through the back of the unit.
4. To replace-reverse the above procedure.
Replacement of main connector
This is located at the back of the unit below the fuse holders.
1. Cut back the heat shrink on the three wires.
2. Unsolder the three connections and pull from connector.
3. Release main connector by holding the nuts with a spanner and then on the outside back of
the unit, release the two screws one at a time (using a screwdriver). The main connector
should now be loose.
4. To replace-reverse the above procedure.
Replacement of main switch
This is located on the front panel below the membrane pad.
1. Remove the wires noting their position.
2. Remove the switch by pushing it out from the back towards the rear of the front panel.
3. Push in the new switch and re-connect.
- 15 -