UVPS 81-0112-01 Rev C Light Therapy Device User Manual


 
UV CROSSLINKERS UVP
5. Cut all of the cable ties coming from the tube holder following the two wires from the
tube holder to where it terminates. Note: there will be two different termination points for
each tube holder. Once this has been located, cut the wires (marking them to ensure easy
replacement).
6. The tube holder(s) can now be removed by pushing the holder into the main chamber and
feeding the wires through the cut-out.
7. Replace tube holder(s). (Part number 36-0003-01)
8. In order to refit the tube holder, reverse the above procedure using butt crimps to
reconnect the wires.
Note: If more than one tube holder is to be replaced, the wiring schematic diagram may be of
assistance.
Replacement of starters
1. Locate the starter to be changed. These are positioned in a vertical row on the right hand
side of the internal chassis assembly.
2. Turn starter(s) 30 degrees anti-clockwise and then pull out of the holder.
3. Reverse above procedure with recommended starter.
Replacement of starter holder
1. Locate the starter holder to be changed. It is located on the right hand side of the internal
chassis assembly.
2. Lever off the starter holder using a flat bladed screwdriver. The holder should now be
loose.
3. Replace unit (part number 36-0005-01). This is achieved by first loosening the internal
reflector which is held in place with eight screws. The screws can be located in the
chamber of the crosslinker - two on the left, two on the right and four on the top of the
chamber.
4. To replace the starter holder first push the center of the two black spigots, which hold the
starter holder (x2) away from you i.e. towards the crosslinker chamber. As the reflector
has been loosened, this should be done fairly easily with a small, flat-bladed screwdriver.
5. The starter can now be relocated.
- 14 -