Teledyne Percent Oxygen Analyzer Oxygen Equipment User Manual


 
Percent Oxygen Analyzer Installation
Teledyne Analytical Instruments 29
Figure 3-5: Connections to Probe
3.5 Installation Checklist
Prior to powering up the unit make sure you have:
Installed the unit correctly
Checked the probe and welded probe socket for leaks
Once the above checks have been made, you can connect the power
source. Wait approximately 30 minutes for warm up, two hours wait is
best. After that, the instrument is ready for operation.