Teledyne Percent Oxygen Analyzer Oxygen Equipment User Manual


 
Percent Oxygen Analyzer Installation
Teledyne Analytical Instruments 23
Installation
Installation of the analyzer includes:
1.
Unpacking the system.
2.
Mounting the control unit.
3.
Installing the probe.
4.
Making electrical connections.
5.
Testing the installation.
CAUTION: READ THIS CHAPTER IN ITS ENTIRETY BEFORE
INSTALLING THE SYSTEM.
FOR INDOOR USE ONLY.
3.1 Unpacking the Analyzer
As soon as you receive the instrument, carefully unpack and inspect
the control unit, and any included accessories for damage. Immediately
report any damage to the shipping agent. The analyzer is shipped with
all the materials you need to install and prepare the system for operation.
3.2 Control Unit Installation
The 9060L control unit is designed to be panel mounted in a
general purpose, indoor area, away from moisture and the elements. The
unit should be installed at viewing level in a sheltered area.
Refer to the Outline Diagram D-77712 in the Appendix for the
physical dimensions of the analyzer.
3.3 9060L Oxygen Probe Installation
To install the probe, weld a BSP or NPT socket to the flue in a
suitable position for flue gas sensing. For the correct size of socket refer
to probe specifications located in the Appendix.