Invacare 1150703 Personal Lift User Manual


 
SECTION 7—MAINTENANCE
Roze™ Stand Up Patient Lift 22 Part No. 1150703
SECTION 7—MAINTENANCE
Maintenance Safety Inspection Checklist
NOTE: Follow the maintenance procedures described in this manual to keep your patient lift in continuous service.
The Invacare Patient Lift is designed to provide a maximum of safe, efficient and satisfactory service with minimum care and
maintenance.
All parts of the Invacare Lift are made of the best grades of steel, but metal to metal contact will wear after considerable use.
There is no adjustment or maintenance of the casters, other than cleaning, lubrication and checking axle and swivel bolts for
tightness. Remove all debris, etc. from the wheel and swivel bearings. If any parts are worn, replace these parts IMMEDIATELY.
If you question the safety of any part of the lift, contact your Dealer IMMEDIATELY.
ITEM INITIALLY
INSTITUTIONAL
INSPECT/ADJUST
MONTHLY
IN-HOME INSPECT
EVERY SIX (6)
MONTHS
THE BASE
Inspect for missing hardware.
Legs open/close with ease.
Inspect casters and axle bolts for tightness and wear.
Inspect casters for smooth swivel and roll.
Inspect wheels are clear of debris.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
THE MAST
Mast MUST be securely assembled to lift arms.
Inspect for bends or deflections.
X
X
X
X
X
X
THE LIFT ARMS AND LINKAGE
Check all hardware and attachment points.
Inspect for bends or deflections.
Inspect bolted joints of lift arms for wear.
Inspect to ensure that the lift arms are centered
between the base legs.
X
X
X
X
X
X
X
X
X
X
X
X
ELECTRIC ACTUATOR
Check for wear or deterioration.
(IF DAMAGED, CONTACT DEALER)
Cycle to ensure smooth quiet operation.
X
X
X
X
X
X
CLEANING
Whenever necessary. XX X
SLINGS
CHECK ALL SLING ATTACHMENTS each time it is
used to ensure proper connection and patient safety.
Inspect sling material for wear.
Inspect straps for wear.
X
X
X
X
X
X
X
X
X