5. Apply liberal bead of case joint sealant (butyl) to rst
case. Sealant area is shown using a dotted line in
illustration in Step 8. Apply heavy amount to cover
entire shaded area.
DO NOT USE PERMAGUM!
It is the contractor’s responsibility to install
case(s) according to local construction and
health codes.
6. Slide second case up to rst case snugly. Then level
second case to the rst case so glass front, bumper
and top are ush.
Do not use bolts to pull cases together.
7. To compress butyl at joint, use two Jurgenson
wood clamps. Make sure case is level from front to
back and side to side on inside bulkheads at joint.
8. Attach sections together via the bolts pictured in the
illustration below.
9. Apply bead of butyl to top of bulkheads
and slip on stainless steel bulkhead cap. Also apply
silicone to seam between overhead light tubes.
10. Use nger to smooth silicone as thin as possible at
masking tape on inside and outside of rear mullion
(apply additional silicone if necessary). Remove
tape applied on line #4.
11. Remove front, back and end shipping braces.
Q1-DC Refrigerated Wedges and Standard Cases
Line-up taper pins and line-up plates with holes on adjoining
case. Bolting is located at the rear of the case, behind the
air discharge wall, and behind the front body panel. The
cases are bolted together in front by means of a bracket
located behind the front panel. Remove the front panel by
unscrewing these bottom screws.
FRONT BODY PANEL REMOVED
FOR ACCESS TO FRONT CASE BOLTING
FRONT CASE BOLT
(UPPER 3/8" HOLE)
LINE-UP PLATE
(INSERT INTO ALUMINUM PROFILE)
LINE-UP PLATE
(INSERT INTO VERTICAL SLOT)
LINE-UP PIN
(INSERT INTO OUTER 1/2" HOLE)
CASE BOLTING (MULTIPLE 3/8" HOLES)
ACCESS BEHIND AIR DISCHARGE WALL
CASE BOLTING
USE 1/4"- 20 X 1 1/2" SCREW AT TOP
CASE BOLTING (UPPER EXTERIOR FRAME)
USE 3/8" X 5 1/2" BOLTS OR 3/8" ALLTHREAD
Q SERIES CASE JOINING GUIDE
LINE-UP TAB
(AT BACK OF BUMPER)