9
ASSEMBLY INSTRUCTIONS
Figure 5
15. Hang the Load Cell Assembly on the two hooks at the end of the Lifter Boom, using the
loops on top of the Load Cell Assembly.
16. Connect the end of the Load Cell Cable coming out of the center of the Load Cell Assembly
to its port in the Lifter Boom.
17 Use the two washers and shoulder screws to connect the two Stretcher Hoops to the Load
Cell Assembly and tighten well.
18. Connect the two right stretcher bars by screwing them onto one Stretcher Bar Connector, in
order to make one long Stretcher Bar.
19. Repeat step 9 with the left Stretcher Bar.
20. Insert the two bars into the open side of the channel-pockets in the Stretcher Sheet and
through the two hanging loops sewn into both sides of the Stretcher. The Stretcher Bars
should not protrude from the Stretcher Sheet at either end. Make sure one end on both
channel-pockets is sealed with Velcro.
Note
: Make sure the bars are inserted into the two hanging loops sewn on both sides of the
stretcher. This will ensure that the Stretcher Bars hang correctly from the hanging loops.