Gentek 3950302 Scale User Manual


 
5
C
C
H
H
A
A
P
P
T
T
E
E
R
R
2
2
P
P
R
R
E
E
R
R
E
E
Q
Q
U
U
I
I
S
S
I
I
T
T
E
E
S
S
Before you install the filtered enclosure, you need to prepare your
site for installation. You must be certain that the area is level and
of solid construction. In addition, a dedicated source of electrical
power should be located near the installation site to power the
filtered enclosure, balance and other apparatus. Additionally, the
enclosure should be strategically placed in the lab to provide
efficient workflow.
Carefully read this chapter to learn the requirements for your
installation site:
The support, vibration and movement requirements.
The temperature variation requirements.
The humidity and static electricity requirements.
The location and air current requirements.
The exhaust and blower requirements.
The electrical power requirements.
The space requirements.
Refer to Appendix B: XPert Dimensions for complete enclosure
dimensions.
Refer to Appendix C: XPert Specifications for complete filtered
enclosure electrical and environmental conditions, specifications
and requirements.