GM MANTS420 Oxygen Equipment User Manual


 
Model TS420
ii
System Integrity Verification
General Monitors mission is to benefit society by providing solutions through industry leading
safety products, services and systems that save lives and protect capital resources from the
dangers of hazardous flames, gases and vapors.
The safety products you have purchased should be handled carefully and installed, calibrated
and maintained in accordance with the respective product instruction manual. Remember
these products are for your safety.
To ensure operation at optimum performance General Monitors recommends that certain
maintenance items are performed.
Commissioning Safety Systems
Before power up, verify wiring, terminal connections and stability of mounting for all integral
safety equipment including, but not limited to:
! Power supplies
! Control modules
! Field detection devices
! Signaling / output devices
! Accessories connected to field and signaling devices
After the initial application of power (and any factory specifies warm-up period) to the safety
system, verify that all signal outputs, to and from devices and modules, are within the
manufacturers’ specifications. Initial calibration / calibration checking / testing should be
performed per the manufacturers’ recommendations and instructions.
Proper system operation should be verified by performing a full, functional test of all component
devices of the safety system, ensuring that the proper levels of alarming occur.
Proper system operation should be verifies by performing a full, functional test of all component
devices of the safety system, ensuring that the proper levels of alarming occur.
Fault/Malfunction circuit operation should be verified.