Quick Installation Guide
00825-0100-4593, Rev BA
July 2009
Rosemount 1151
3
STEP 1: MOUNT THE TRANSMITTER
A. Applications
Liquid Flow Applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
Gas Flow Applications
1. Place taps in the top or side of the line.
2. Mount beside or above the taps.
Steam Flow Applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Fill impulse lines with water.
Flow
Flow
Flow
4593_Rev_BA.fm Page 3 Friday, August 7, 2009 3:38 PM