754748-100 Rev. C
6
7
6
Install temporary braces to hold the
center of the back and side panels tight
to the studs for approximately 24 hours
while adhesive sets. Add cushioning
between panels and braces to prevent
scratching the panels.
When installing greenboard, position
drywall screws above the top nailing
flange. If you choose to screw
through the nailing flange, you
MUST drill clearance holes in the
flange to avoid cracking/damaging
the flange.
8
A) After greenboard is installed, apply finished sealant bead to all edges and joints. Follow sealant manufacturers’
recommended cure time.
B) Make connections to supply and drain lines.
Green Board