5
A) Apply a bead of tub surround adhesive down
each stud that will come in contact with the side
panels being sure to stay below the line
previously marked.
B) Lay a bead of sealant along side panel mating
surface and tub ledge.
C) Align the top nailing flange of each side
panel with pencil line marked. Press firmly into
place to ensure proper adhesion to studs.
Check alignment with all mating surfaces and
reposition if necessary.
D) Locate and drill a clearance hole in the center of the top
nailing flange and centered on each stud (see arrows as shown).
Also drill clearance holes in the front nailing flange on each side
panel at approx. 12" intervals, centered on the flange (see arrows
as shown).
Install galvanized screws through each hole and into the studs,
securing the wall panel.
Sealant
(side panel
mating surface)
Drill clear
an
ce
holes for
screws
Tub Surround
Adhesive (studs)
Pencil line
Sealant (tub edge)