![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/a/d6/ad6462b1-8c58-42df-ac2e-00913053de61/ad6462b1-8c58-42df-ac2e-00913053de61-bg2b.png)
Running studies
Starting a run
053-644, Rev E Page 37 eg4 & eg3
With a couple pushes on the keypad buttons, you will be running and viewing your study (ies).
Following your study (ies), you can load the data/files into QSP-II to manipulate, analyze, save,
and create reports (See Chapter 5 for viewing your logged data in QSP-II).
How to run a noise study
1. If your dosimeter is turned off, press the on/off enter button to power on.
2. Press and hold the run/stop button.
A 3, 2, 1 countdown will appear.
3. When running, the following will appear:
A run indicator will appear on the top-right side.
The LED indicator will flash green (unless you disabled this in DMS.)
Figure 4-8: Display screen while running
Run indicator
Appears when running
Flashing green LED
indicates running
Measurements
Use up/down arrow
to move through
values.
Views are
customizable via
QSP-II setup