Teledyne LXT-220 Oxygen Equipment User Manual


 
Dissolved Oxygen Controller Installation
Teledyne Analytical Instruments 19
Installation
Installation of the LXT-220 Controller involves:
Unpacking the instrument
Mounting
Making Electrical Connections
Configuring the Instrument
Calibration
2.1 Unpacking the Instrument
The LXT-220 Controller has been carefully packaged to protect it
from damage during shipment and dry storage. Upon receipt please
follow the procedure outlined below:
1. Before unpacking, inspect the condition of the shipping container
to verify proper handling by the carrier. If damage is noted, save
the shipping container as proof of mishandling for the carrier.
2. Check the contents of the shipping container with the items and
quantities shown on the packing list. Immediately report any
discrepancies to TI/TAI.
3. Save the original packing material until you are satisfied with the
contents. In the event the transmitter must be returned to the
factory, the packing material will allow you to properly ship it to
TI/TAI.
4. Familiarize yourself with the instrument before installation, and
follow proper installation and wiring procedures.
2.2 Mounting
Three typical installation configurations are available for the LXT-
220:
Universal mounting plate