Kohler K-1221-AC Bathroom Aids User Manual


 
12
106548-CA (9437)
Kohler Co., Kohler WI
8. INSTALLATION REQUIREMENTS
A. TOOLS REQUIRED
S Conventional woodworking tools
S Arc pliers or 14” pipe wrench
S Rule
S Level
S Safety shoes
S Safety glasses
S Square
S Screwdriver
S Pliers
S Utility knife
B. MATERIALS REQUIRED
S Plumbers putty
S Water-resistant sealer
S Wall coverings, as necessary
S RTV silicone sealant
S Four 1/4” x 1” lag screws
C. CLEARANCE REQUIREMENTS
Check roughing-in and room dimensions in order to
provide adequate available space for the bath unit.
D. NEW OR REPLACEMENT INSTALLATION
REQUIREMENTS
This bath unit can be installed in new or existing
bathrooms.
For new installations: Position plumbing according to
roughing-in dimensions beginning on page 5. Cap
supplies and check for leaks.
For replacement installations: Remove old bath,
remove old wall material and remove old floor covering
from area. Remove old plumbing which does not
conform to roughing-in requirements.