Installation
Installation and Operation 13
Mobil Mounting
Mobil Mounting Layout
Plan the layout for easy operator access to the pump air
controls, sufficient space to change drums, and a
secure mounting platform.
Drum Mounting
1. Place the drum in the desired location.
2. Place the hold-down lugs (Y) or drum locators (X)
around the drum base and bolt directly to the truck
bet or mounting platform. See F
IG. 8.
F
IG. 8
Open Drum, Cover-Mounted Pumps
1. Remove the original drum cover.
2. Mount the new drum cover and fasten in place.
3. Guide the pump extension tube through the mount-
ing gasket.
4. Align the drum cover eyelets (T) with the hold-down
rods (W), install the cover brackets (V) and wing
nuts (U) and tighten securely. See F
IG. 8.
Closed Bung-Type-Drum, Cover-Mounted
Pump
1. Insert the pump extension tube through the gasket
(Z) and drum cover (AA). Fasten the Fire-Ball 300
from the top and the Fire-Ball 425 from the bottom.
See F
IG. 9.
2. Slide the rubber grommet (BB), tapered end down,
onto the extension tube and push it up against the
pump base. See F
IG. 9.
3. Guide the pump extension tube through the drum
bung hole (CC) and place the cover on the drum.
See F
IG. 9.
4. Align the drum cover eyelets (T) with the hold-down
rods (W), install the hold-down brackets (V) and
wing nuts (U) and tighten securely. See F
IG. 8.
F
IG. 9
T Drum cover eyelets
U Wing nuts
V Hold-down brackets
W Hold-down rods
X Drum locators
Y Hold-down rod lugs
T
U
V
W
X
Y
Z Gasket
AA Drum cover
BB Grommet
CC Bung Hole
Z
AA
BB
CC