Graco 225 Wheelchair User Manual


 
Installation
Installation and Operation 13
Mobil Mounting
Mobil Mounting Layout
Plan the layout for easy operator access to the pump air
controls, sufficient space to change drums, and a
secure mounting platform.
Drum Mounting
1. Place the drum in the desired location.
2. Place the hold-down lugs (Y) or drum locators (X)
around the drum base and bolt directly to the truck
bet or mounting platform. See F
IG. 8.
F
IG. 8
Open Drum, Cover-Mounted Pumps
1. Remove the original drum cover.
2. Mount the new drum cover and fasten in place.
3. Guide the pump extension tube through the mount-
ing gasket.
4. Align the drum cover eyelets (T) with the hold-down
rods (W), install the cover brackets (V) and wing
nuts (U) and tighten securely. See F
IG. 8.
Closed Bung-Type-Drum, Cover-Mounted
Pump
1. Insert the pump extension tube through the gasket
(Z) and drum cover (AA). Fasten the Fire-Ball 300
from the top and the Fire-Ball 425 from the bottom.
See F
IG. 9.
2. Slide the rubber grommet (BB), tapered end down,
onto the extension tube and push it up against the
pump base. See F
IG. 9.
3. Guide the pump extension tube through the drum
bung hole (CC) and place the cover on the drum.
See F
IG. 9.
4. Align the drum cover eyelets (T) with the hold-down
rods (W), install the hold-down brackets (V) and
wing nuts (U) and tighten securely. See F
IG. 8.
F
IG. 9
T Drum cover eyelets
U Wing nuts
V Hold-down brackets
W Hold-down rods
X Drum locators
Y Hold-down rod lugs
T
U
V
W
X
Y
Z Gasket
AA Drum cover
BB Grommet
CC Bung Hole
Z
AA
BB
CC