E&J 3K01-INS-LAB-RevA12 Wheelchair User Manual


 
 
MAINTENANCE SCHEDULE
Procedure Perform at least every
Week month 3 months 6 months
Check tire wear
Check handrims
Check wheel lock engagement
Check anti-tippers (optional)
Wipe off frame with soft cloth
Check handgrips
Check upholstery
Check rear wheel adjustment
Check arms
Check backposts / push handles
Check footrests / elevating legrests
Clean frame
Check caster stem rotation
GF dealer maintenance check
Check rear wheel bearings (dealer)
Check caster bearings (dealer)
Metro IC4 Metro IC4 Metro IC4

The tools and cleaning supplies listed will assist in the procedures
outlined in Section 7.
30 weight oil (available at most auto parts stores)
Phillips screwdriver
soft cloth
mild soap and water solution

Always evaluate the overall operation of your wheelchair. It should
function with ease and should travel straight without excessive drag or
pull to one side.
Remember, your Graham-Field authorized distributor knows your
wheelchair best when it comes to service and repairs. Contact your
distributor with any questions or concerns regarding the safe operation
and maintenance of your wheelchair. Regular maintenance is essential
for your safety and continued operation of your wheelchair.