Braun FMVSS NO. 403 Personal Lift User Manual


 
Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 31312 Rev. A
X
UP
Switch
Lift Operating Instructions
S
LEVEL
Switch
UP
Switch
Inboard Locator
(unfolded)
TO STOW PLATFORM:
1. Press STOW switch until platform
stops (fully stowed - vertical). Re-
lease switch.
2. Press STOW switch (Photo Y) until
platform sections close (rotate) to
locked position. See Photos AA-CC.
TO CLOSE DOOR(S):
Power Door Operator(s):
Press the STOW switch until door(s)
are fully closed. Release switch.
Manual Door(s):
Manually close door(s) fully.
TO LOAD PASSENGER:
1. Load passenger onto platform fac-
ing outward and lock wheelchair
brakes. See Photos Q and R.
Note: Outer barrier must be fully
unfolded until entire wheelchair
has crossed the barrier. See Pho-
tos O and P.
2. Press UP switch until platform
raises just above ground level.
Release switch.
3. If necessary, press the switch arm
LEVEL switch until platform is level.
4. Press UP switch until platform stops
(reaches oor level) and inboard
locator unfolds (see Photo W). Re-
lease switch.
5. Unlock wheelchair brakes and unload
passenger from platform.
O
P
RQ
T
U
V
W
Y
Z
BB
AA
DD
CC