29
4
Insert the three black lines at the
end of the test strip into the strip
port.
5
Push the test strip in until it
stops.
The monitor turns on automatically.
These items show on the display
window, one after the other:
•Display Check – Remember to
make sure that all items in the
picture here show on the display
window. (See Chapter 1 for more
information about the Display
Check.)
•Time, month, and day (if set)
If date and time are not set, dashes
will show instead of numbers.
•LOT 00000 number for the calibrator
you are using.
•Apply Sample message, which tells
you that the monitor is ready for
you to apply control solution to
the test strip.
Control Solution
Testing
ART21258_Rev-A-Man.indd 32 1/12/10 3:38:47 PM