3-7
Trace Oxygen Analyzer Installation 3
Teledyne Analytical Instruments
3.5 Installation Checklist
Before connecting the instrument to the power source and turning it on,
make sure you have:
• Correctly installed the Sample and Exhaust gas lines
• Checked for leaks
• Set the sample pressure to 5–10 psig (34.5 - 68.9 kPa), nominal
(for non-vacuum service units)
• Set the flow
Once the above checks have been made, you can connect to the power
source. The instrument is now ready for operation.