LF1050-INS-LAB-RevE13
10
9. Attach the spreader bar bracket to the boom and insert retainer pin, as shown above. Insert
retaining ring through retainer pin to secure spreader bar to boom.
Pendant plug
Actuator plug
10. Insert the actuator plug into the control box, as shown above.
11. Insert the pendant plug into the control box, as shown above.
Info: Before using the lift, charge the batteries for ten to twelve hours (see instructions on
following page).